Humber Connected: Camus news!
(Originally broadcast March 5th 2012)
Today's House Blogger was Paul
Beginning of rehearsal- 12:40pm
Media on Final Cut Pro goes offline and interrupts show- 12:15pm
-Michael decides to proceed with show as there is no final cut pro available.
Show rehearsal ends- 12:55pm
-Hold positions
-Call for production meeting but there was no time
-Show has to be live at 1:00pm
Rolling and Recording for live show- 12:59
-Had to skip Bars & Tone
Micheal says show is going well so far even though there was no production meeting before show went live - 1:07
Rakesh must drag show on to fill time- 1:12
End of show- 1:16
After all the show turned out very well with the help of all the crew. Everyone did as they should and the show went smoothly for the late start we had.
Check out these "behind-the-scenes" photos from todays production!
Today's Production Crew
PRODUCER: Huey
DIRECTOR: Michael
Assistant Director: Kirsten
HOST #1: Rakesh
HOST#2: Cameron
Switcher TD: Brian
Floor Director: Chris
Camera 1: Matt
Camera 2: Jeremy
Camera 3: Pasquale
Audio Operator: Christian
Graphics/Electronic Titles: Alex
Teleprompter: Michelle
Video Playback/Record Operator: Griff
Shader: Cassandra
Blogger/ Photographer: Paul